Difference between revisions of "Ntesfaio Week 12/13"
Jump to navigation
Jump to search
(→Week 12/13 Milestones: added signature and position tdescription for week 12/13) |
(→Week 12/13 Milestones: added to milestones) |
||
Line 1: | Line 1: | ||
==Electronic Lab Notebook== | ==Electronic Lab Notebook== | ||
− | ==Week 12/13 Milestones== | + | ===Week 12/13 Milestones=== |
===Project Manager=== | ===Project Manager=== |
Revision as of 18:39, 23 November 2019
Contents
Electronic Lab Notebook
Week 12/13 Milestones
Project Manager
- This week, my role as project manager was to oversee the progress of the team's work. I also worked with communicating with the other project managers to have a consistent meta spreadsheet of all our information. My role will continue by working with all members of the team with check ins and forming the schedule needed to complete all the tasks.
Quality Assurance
- This week, my role as a quality assurance guild was to work alongside the data analysts in going through the excel spreadsheet. While doing this, I worked with the designer on contributing to the class meta spreadsheet so that our information was consistent with the two groups.
Ntesfaio (talk) 18:39, 23 November 2019 (PST)
Ntesfaio Final Individual Reflection