Difference between revisions of "Ntesfaio Week 12/13"

From LMU BioDB 2019
Jump to navigation Jump to search
(Electric Lab Notebook: added two milestones)
(References: added article reference)
 
(16 intermediate revisions by the same user not shown)
Line 1: Line 1:
==Individual Journal Assignment==
+
==Week 12/13 Milestones==
  
===Electric Lab Notebook===
+
===Project Manager===
 +
 
 +
# This week, my role as project manager was to oversee the progress of the team's work. I also worked with communicating with the other project managers to have a consistent meta spreadsheet of all our information. My role will continue by working with all members of the team with check ins and forming the schedule needed to complete all the tasks.
 +
 
 +
===Quality Assurance===
 +
 
 +
# This week, my role as a quality assurance guild was to work alongside the data analysts in going through the excel spreadsheet. While doing this, I worked with the designer on contributing to the class meta spreadsheet so that our information was consistent with the two groups.   
  
===Project Manager===
+
==Purpose==
  
=== Milestone 1: Project “Scaffolding” ===
+
The purpose of this week's assignment is to continue building on the team's wiki page and to progress through the milestones for each of the categories.
  
This milestone pertains to setting up an initial schedule and any resources that your team will use for the duration of the project. It will be useful to get an overview of every team member’s own milestones so that you have an accurate big picture view.
+
==Methods==
  
# In consultation with your team, work backward from the final deadline to set intermediate deadlines for each deliverable. In particular you need to set deadlines for what you will accomplish by the journal deadline for [[Week 11]], [[Week 12/13]], and [[Week 15]].
+
* Downloaded the information from the article link
# Organize management tools for your team:
 
#* Communication tools
 
#* Workflow narratives
 
#* Action items
 
#* Testing results/reports
 
#** Bugs/feature requests
 
#** Question/answer sequences
 
  
=== Milestone 2: Periodic Updates ===
+
* Put the information into one excel worksheet
  
Not as much a milestone as an on-going task, once the project is up and running the Project Manager is responsible for keeping track of everyone’s progress.
+
* Ran an ANOVA
  
# Get periodic updates on progress; in particular, the project’s “place” in the overall flow should be known at all times (transparency). Team members will be giving a status reports in class for the rest of the semester.  However, the instructor will expect you to know and be able to report on the status of each member of your team at any time.
+
==Conclusion==
# Familiarize yourselves with the specific milestones of [[Quality Assurance|each]] [[Coder/Designer|team]] [[Data Analysis|member]] so that you know how to monitor the team’s overall progress.
 
# Monitor the status of the report-in-progress and other related documentation.
 
# Coordinate team decisions and action items addressing any unforeseen delays or roadblocks.
 
  
{{Template:Ntesfaio}}
+
This week's assignment led to more work being done to complete the milestones. By running the ANOVA we are now ready to go onto STEM.
  
 
==Acknowledgments==
 
==Acknowledgments==
 +
 +
My homework partners this week were User:Jnimmers (Quality Assurance), User:Imacarae (Data Analysis), User:Mavila9 (Data Analysis), and User:Dmadere (Designer). We continued working on our Team page and the milestones following the downloading of the excel spreadsheet values.
 +
 +
LMU BioDB 2019. (2019). Week 12/13. Retrieved November 25, 2019, from https://xmlpipedb.cs.lmu.edu/biodb/fall2019/index.php/Week_12/13
 +
 +
'''"Except for what is noted above, this individual journal entry was completed by me and not copied from another source."''' [[User:Ntesfaio|Ntesfaio]] ([[User talk:Ntesfaio|talk]]) 10:53, 25 November 2019 (PST)
  
 
==References==
 
==References==
 +
 +
Thorsen, M., Lagniel, G., Kristiansson, E., Junot, C., Nerman, O., Labarre, J., & Tamás, M. J. (2007). Quantitative transcriptome, proteome, and sulfur metabolite profiling of the Saccharomyces cerevisiae response to arsenite. Physiological genomics, 30(1), 35-43. DOI: https://doi.org/10.1152/physiolgenomics.00236.2006
 +
 +
https://xmlpipedb.cs.lmu.edu/biodb/fall2019/index.php/Week_12/13
 +
 +
https://xmlpipedb.cs.lmu.edu/biodb/fall2019/index.php/Sulfiknights
 +
 +
File:NtesfaioThorsen 2007 PMID 17327492 (1).zip
 +
 +
[[User:Ntesfaio|Ntesfaio]] ([[User talk:Ntesfaio|talk]]) 18:39, 23 November 2019 (PST)
 +
 +
{{Template:Ntesfaio}}

Latest revision as of 21:21, 25 November 2019

Week 12/13 Milestones

Project Manager

  1. This week, my role as project manager was to oversee the progress of the team's work. I also worked with communicating with the other project managers to have a consistent meta spreadsheet of all our information. My role will continue by working with all members of the team with check ins and forming the schedule needed to complete all the tasks.

Quality Assurance

  1. This week, my role as a quality assurance guild was to work alongside the data analysts in going through the excel spreadsheet. While doing this, I worked with the designer on contributing to the class meta spreadsheet so that our information was consistent with the two groups.

Purpose

The purpose of this week's assignment is to continue building on the team's wiki page and to progress through the milestones for each of the categories.

Methods

  • Downloaded the information from the article link
  • Put the information into one excel worksheet
  • Ran an ANOVA

Conclusion

This week's assignment led to more work being done to complete the milestones. By running the ANOVA we are now ready to go onto STEM.

Acknowledgments

My homework partners this week were User:Jnimmers (Quality Assurance), User:Imacarae (Data Analysis), User:Mavila9 (Data Analysis), and User:Dmadere (Designer). We continued working on our Team page and the milestones following the downloading of the excel spreadsheet values.

LMU BioDB 2019. (2019). Week 12/13. Retrieved November 25, 2019, from https://xmlpipedb.cs.lmu.edu/biodb/fall2019/index.php/Week_12/13

"Except for what is noted above, this individual journal entry was completed by me and not copied from another source." Ntesfaio (talk) 10:53, 25 November 2019 (PST)

References

Thorsen, M., Lagniel, G., Kristiansson, E., Junot, C., Nerman, O., Labarre, J., & Tamás, M. J. (2007). Quantitative transcriptome, proteome, and sulfur metabolite profiling of the Saccharomyces cerevisiae response to arsenite. Physiological genomics, 30(1), 35-43. DOI: https://doi.org/10.1152/physiolgenomics.00236.2006

https://xmlpipedb.cs.lmu.edu/biodb/fall2019/index.php/Week_12/13

https://xmlpipedb.cs.lmu.edu/biodb/fall2019/index.php/Sulfiknights

File:NtesfaioThorsen 2007 PMID 17327492 (1).zip

Ntesfaio (talk) 18:39, 23 November 2019 (PST)

Bio DB Home page

Template:Ntesfaio

Week 1

User:Ntesfaio

Class Journal Week 1

Week 2

Ntesfaio Week 2

Class Journal Week 2

Week 3

RAD53 / YPL153C Week 3

Class Journal Week 3


Week 4

Ntesfaio Week 4

Class Journal Week 4

Week 5

DrugCentral Week 5

Class Journal Week 5

Week 6

Ntesfaio Week 6

Class Journal Week 6

Week 7

Ntesfaio Week 7

Class Journal Week 7

Week 8

Ntesfaio Week 8

Class Journal Week 8

Week 9

Ntesfaio Week 9

Class Journal Week 9

Week 10

Ntesfaio Week 10

Week 11

Ntesfaio Week 11

Sulfiknights

Week 12/13

Ntesfaio Week 12/13

Sulfiknights

Sulfiknights Deliverables

Ntesfaio Week 15

Ntesfaio Final Individual Reflection